complete the MPS plans for both end items and to create material requirements plans (MRP) for any 5 items in the BOM.
see the requirements in the word , then complete the excel sheet.
BA
Assignment 2
Clodhopper Clodbuster
Background:
Your company has just acquired a new subsidiary that makes two products, Clodhopper and Clodbuster. The Clodhopper is intended for the general consumer market and its demand is higher and more seasonal than the Clodbuster, which is intended for the commercial user market. Both products share a number of component parts and subassemblies, primarily differing in their engine and tiller subassemblies. You have been assigned to run this acquisition. The only planning information you have is historical data.
Assignment:
Your task is to complete the MPS plans for both end items and to create material requirements plans (MRP) for any 5 items in the BOM.
· First complete all of the information in the MPS plans.
· Then, using the MRP forms supplied in the spreadsheets. Fill in all appropriate data (lot size, ordering rule, etc).
· Do not make any changes to the format/layout of the spreadsheet. This is one place in industry where creativity in presenting data is not appreciated since many of the cells in the forms are normally linked, and changes can lead to significant errors in the results.
· Use the comment function to show the formula for “projected on-hand inventory.” The formula must be understandable (e.g. ”beginning inventory + production…” NOT “D12 + E12…”) and a comment must be entered in each cell that you calculate projected on-hand inventory.
Data:
The “Assignment 2 ” spreadsheet contains
five
different worksheets:
· MPS plans for Clodhopper and Clodbuster for the first three months of 2018.
· Bill of materials data for ClodHopper and ClodBuster, including quantities required per product and assembly times/lead times
· Inventory records and lot-sizing rules for all subassemblies and component parts
· Scheduled receipts (production commitments and purchase orders that have been scheduled by previous MPS and MRP plans for delivery in 2018.
· MRP forms to use for your choice of five items in the BOM
Additional information:
· Remember that the FOQ lot-sizing rule allows multiple orders. That is, if your plan requires 450 units in a given period, current inventory is 75 units, and the FOQ order size is 100 units, then you would request 400 units (four orders) from the vendor or assembly production line.
· For items purchased using the POQ lot-sizing rule, consider that the time between orders begins at the start of the plans. That is, if the POQ period is 3, you can only have planned receipts (or scheduled receipts) in periods 1, 4, 7, and so on. Unlike the other ordering schemes where you first determine when a new order must be received and then schedule the order earlier according to the lead time, for POQ you look at future needs that must be satisfied until another POQ order can be placed.
· Do not schedule MRP planned orders in the line for scheduled receipt items. Scheduled receipts have already been started or ordered on previous MRP plans for delivery in 2018 and you are not allowed to make any additional entries on this line. The values on this line are to be added to the projected on-hand inventory when each scheduled receipt arrives. Do not reflect the scheduled receipts into planned order releases.
· Some parts and subassemblies have desired safety stock levels. Be sure to order enough or early enough to ensure these levels are maintained, limited only by any lead-time constraints. When there is no safety stock, maintain the projected on-hand greater than or equal to zero.
· Use the power of Excel as much as possible for filling out your MPS and MRP forms. Doing so will save you considerable time in completing your assignment and is representative of how these processes are done in industry. Use the comment function to show the formula for “projected on-hand inventory” calculations for both the MPS and MRP forms.
Hint: Entering new order quantities (planned receipts) when needed is best done manually whenever the on-hand inventory values indicate that you would not have enough unless an order is placed.
Assignment 2 Grading:
There are 50 points possible on this assignment. Grading criteria include proper application of the planning methods, following all directions, and professional appearance of your work, including application of Excel.
Use the Excel file: BA 314 Assignment 2 W18 for the required information and forms
Clodhopper
A
Handlebar Assembly
C
Powerhead Assembly
H
Instruction Manual
M
Steel Tubing
D
Control Cable
E
Control
Assembly
F
Tiller Blade
Unit
K
Engine
(standard)
J
Gearbox
Assembly
I
Grips
G
Clodhopper BOM
Clodbuster
B
Handlebar Assembly
C
HD Powerhead
Assembly
P
Instruction Manual
M
Steel Tubing
D
Control Cable
E
Control
Assembly
F
HD Tiller
Blade Unit
N
Engine
(heavy duty)
L
Gearbox
Assembly
I
Grips
G
Clodbuster BOM
Clodhopper
A
Handlebar Assembly
C
Powerhead Assembly
H
Instruction Manual
M
Steel Tubing
D
Control Cable
E
Control Assembly
F
Tiller Blade Unit
K
Engine (standard)
J
Gearbox Assembly
I
Grips
G
Clodhopper BOM
Clodbuster
B
Handlebar Assembly
C
HD Powerhead Assembly
P
Instruction Manual
M
Steel Tubing
D
Control Cable
E
Control Assembly
F
HD Tiller Blade Unit
N
Engine
(heavy duty)
L
Gearbox Assembly
I
Grips
G
Clodbuster BOM
> S – pproved
A 3 4 Assignment 2 – Worksheet 1: MPS Approved plan
tem: A
lodhopper (Winter2 18)
ot Size Rule:
:
an 2018
eb 2018
450 450 600 600 600 500 600 0 0 0 0 and Inventory
MPS : B
Rule: Safety Stock Level: Mar 2018 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 300 300 300 400 400 400 400 1000 1100 0 0 500 0 0 0 MPS Quantity MPS Start Available to Promise ata
BOM (Product A)
ame
Quantity Lead Time 1 2 weeks 1 1 week 2 1 week 1 1 week 1 1 week 1 2 weeks 1 1 week 1 BOM (Product B)
Quantity Assembly Time Lead Time C Handle Bar Assembly 1 2 weeks 1 1 week I Gearbox assembly 1 1 week 1 3 weeks 1 2 weeks M Instruction Manual 1 4 weeks Lot Size 1 week FOQ 1000 1 week 2 weeks 1000 3 weeks feet FOQ 20,000 2 weeks feet FOQ 1 week 750 1 week 750 FOQ 10,000 4 weeks 2500 2 weeks 500 Scheduled Receipts 20,000 Lead Time: Projected On-Hand Inventory Lot Size Rule: Gross Requirements Scheduled Receipts Projected On-Hand Inventory Planned Receipts Planned Order Releases Item: Lot Size Rule: Gross Requirements Scheduled Receipts Projected On-Hand Inventory Planned Receipts Planned Order Releases Lead Time: Gross Requirements Scheduled Receipts Projected On-Hand Inventory Planned Receipts Planned Order Releases Item: Lot Size Rule: Gross Requirements Scheduled Receipts Projected On-Hand Inventory Planned Receipts Planned Order Releases2
M
P
A
B
1
I
C
0
L
Lead Time
Safety Stock Level:
Current Inventory:
J
F
Mar 2018
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6
Week 7
Week 8
Week 9
Week 10
Week 11
Week 12
Forecast
4
50
450
600
2
400
2
500
2600
2
700
Customer Orders Booked
150
350
200
1000
2200
2000
Projected On-
H
Scheduled Receipts
MPS
Quantity
MPS Start
Available to Promise
Item
Clodbuster (Winter2018)
Lot Size
Lead Time:
Current Inventory:
Jan 2018
Feb 2018
Week 1
Week 2
Forecast
300
1100
1200
Customer Orders Booked 200 0 450 0 50
900
Projected On-Hand Inventory
MPS Scheduled Receipts
BOMs
BA 314 Assignment 2 – Worksheet 2: Bill of Materials
D
ClodHopper
N
Assembly Time
A ClodHopper 1
1 week
C
Handle Bar Assembly
2 weeks
D
Steel Tubing 1″ dia
10
feet
3 weeks
E
Control cable
8 feet
F
Control lever assembly
G
Grips
H
Powerhead assembly
I
Gearbox assembly
J
Engine (Standard)
K
Tiller blade unit
M
Instruction Manual
4 weeks
ClodBuster
Name
B ClodBuster 1 1 week
D Steel Tubing 1″ dia 10 feet 3 weeks
E Control cable 8 feet 2 weeks
F Control lever assembly 1 1 week
G Grips 2 1 week P
HD Powerhead assembly
L
Engine (Heavy Duty)
N
HD Tiller Unit
Inventory Records
BA 314 Assignment 2 – Worksheet 3: Inventory Records and Lot-Sizing Rules
Record Date:
31-Dec-17
Item Name
Current Inventory On-Hand
Lot-Size Rule
Lead or Assembly Time
Desired Safety Stock Level
Units
A ClodHopper
5500
FOQ
2500
1500
B ClodBuster
4000
750
C Handle Bar Assembly
3100
L4L
D Steel Tubing 1″ dia
50,000
POQ Period = 4 weeks
20,000
E Control cable
5,000
10,000
F Control lever assembly 2500 L4L 1 week
G Grips 2000 L4L 1 week
H Powerhead assembly 700 FOQ 4000 1 week
I Gearbox assembly
650
5000
J Engine (Standard) 500 FOQ 2500 2 weeks 750
K Tiller blade unit
850
POQ Period = 2 weeks
L Engine (Heavy Duty) 450 FOQ 1000 3 weeks 500
M Instruction Manual
6000
N HD Tiller Unit
1250
POQ Period = 3 weeks
P HD Powerhead assembly 900 FOQ 2000 1 week
BA 314 Assignment 2 – Worksheet 4: Scheduled Receipts
Note: These are purchase order and production commitments scheduled in 2017 that are already scheduled for completion in 2018. The sizes of the orders or production lots are listed by week of scheduled delivery. Include these quantities in “Projected on-hand inventory” – do not include them in “Planned order releases.”
Item Name Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12
A ClodHopper
B ClodBuster
C Handle Bar Assembly
D
Steel Tubing 1″ dia (feet)
100,000
E
Control cable (feet)
F Control lever assembly
G Grips
H Powerhead assembly 200
I Gearbox assembly 5000
J Engine (Standard) 2500 2500 2500 2500
K Tiller blade unit
L Engine (Heavy Duty) 1000 1000
M Instruction Manual 10,000
N HD Tiller Unit
P HD Powerhead assembly 1000
MRP Form – Results
BA 314 Assignment 2 – Worksheet 5: MRP Forms
Item:
Lot Size Rule:
Safety Stock Level:
Current Inventory:
Jan 2018 Feb 2018 Mar 2018
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12
Gross Requirements
Scheduled Receipts
Planned Receipts
Planned Order Releases
Item:
Lead Time:
Safety Stock Level:
Current Inventory:
Jan 2018 Feb 2018 Mar 2018
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12
Lead Time:
Safety Stock Level:
Current Inventory:
Jan 2018 Feb 2018 Mar 2018
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Item: Lot Size Rule:
Safety Stock Level:
Current Inventory:
Jan 2018 Feb 2018 Mar 2018
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12
Lead Time:
Safety Stock Level:
Current Inventory:
Jan 2018 Feb 2018 Mar 2018
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12
Top-quality papers guaranteed
100% original papers
We sell only unique pieces of writing completed according to your demands.
Confidential service
We use security encryption to keep your personal data protected.
Money-back guarantee
We can give your money back if something goes wrong with your order.
Enjoy the free features we offer to everyone
-
Title page
Get a free title page formatted according to the specifics of your particular style.
-
Custom formatting
Request us to use APA, MLA, Harvard, Chicago, or any other style for your essay.
-
Bibliography page
Don’t pay extra for a list of references that perfectly fits your academic needs.
-
24/7 support assistance
Ask us a question anytime you need to—we don’t charge extra for supporting you!
Calculate how much your essay costs
What we are popular for
- English 101
- History
- Business Studies
- Management
- Literature
- Composition
- Psychology
- Philosophy
- Marketing
- Economics